IR70 Add Lane
Project
The Interstate 70 Corridor Study, which was
prepared in 2002 by the TCC, is available for download in the
Reports Library.
The South Limestone Street Corridor
Conceptual Streetscape Master Plan, which was prepared in 2003 by
MSI, is also available for download in the Reports Library.
CLA-70-13.98/20.92, PID 83365 -
Project to widen IR70 to 6 lanes from SR72 to US40
CLA-70-06.75/10.54, PID 82381
- Project to widen IR70 to 3 lanes from Enon Road (SLM 06.75) to the US
68 interchange ramps (SLM 10.55)
Public comments regarding this project are
welcome and can be sent by mail to 3130 E. Main Street, Suite 2A,
Springfield, OH 45505, by fax to (937) 328-3940, or by email to
ccstcc@clarkcountyohio.gov.
All comments must be received by March 15, 2010.
For more information about the project, please
contact Scott Schmid at (937) 521-2133 or e-mail
sschmid@clarkcountyohio.gov.
|