IR70 Add Lane Project

The Interstate 70 Corridor Study, which was prepared in 2002 by the TCC, is available for download in the Reports Library.

The South Limestone Street Corridor Conceptual Streetscape Master Plan, which was prepared in 2003 by MSI, is also available for download in the Reports Library.

CLA-70-13.98/20.92, PID 83365 - Project to widen IR70 to 6 lanes from SR72 to US40

 

CLA-70-06.75/10.54, PID 82381 - Project to widen IR70 to 3 lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55)

Public comments regarding this project are welcome and can be sent by mail to 3130 E. Main Street, Suite 2A, Springfield, OH 45505, by fax to (937) 328-3940, or by email to ccstcc@clarkcountyohio.govAll comments must be received by March 15, 2010.

 

For more information about the project, please contact Scott Schmid at (937) 521-2133 or e-mail sschmid@clarkcountyohio.gov.

 

 

 

 

 

 

 