| Interstate
70 Corridor Study (2002) |
| |
Interstate 70
Corridor Study (entire document, 1.90 Mb) |
| |
Text
Only (704 kb) |
| |
Map 1 -
MIS Study Area (320 kb) |
| |
Map 2 -
1998 ADT Locations (352 kb) |
| |
Map 3 -
Level of Service 2025 (352 kb) |
| |
Map 4 -
Proposed Construction Schedule (320 kb) |
| South
Limestone Street Corridor (2003) |
| |
Conceptual
Streetscape Master Plan (entire document, 4.49 Mb) |
| |
Picture 1 - Overall
Master Plan Rendering (1.35 Mb) |
| |
Picture 2 - Interchange (1.1
Mb) |
| |
Picture 3 -
Rotation of Interchange (1.1 Mb) |
| Lower Valley Pike Scenic Byway Plan (2004) |
| |
Lower Valley Pike Scenic Byway
Plan (entire document, 2.0 Mb) |
| State
Route 794 Sub Area Study (2006) |
| |
Study
without Appendices (14.1 Mb) |
| |
Map 1 - Preferred
Alternative D1 (1.0 Mb) |
| |
Appendix A -
Cultural Resources Red Flag Summary (435 kb) |
| |
Appendix B -
Ecological Resources Red Flag Summary (799 kb) |
| |
Appendix C -
Hazardous Materials (1.5 Mb) |
| |
Appendix D -
Geotechnical Resource Review (52.3 Mb) |
| |
Appendix E -
Public Involvement (140.4 Mb) |
| |
Appendix F -
Property Tax Values (133 kb) |
| |
Appendix
G - Preliminary CE Document (1.1 Mb) |
| US68/US40/SR4/Upper Valley Pike
Sub Area Study (2006) |
| |
Study
Page |
|
Lower Valley Pike Safety Study (2009) |
| |
Study
without Appendices (1.5 MB) |
| |
Appendix A - Physical Condition Diagrams (413 kb) |
| |
Appendix B - Section Photos (35.7 MB) |
| |
Appendix C - Intersection Photos (34.6 MB) |
| |
Appendix D - Crash Diagrams (1.7 MB) |
| |
Appendix E - Traffic Count Data (278 kb) |
| |
Appendix F - Highway Capacity Analysis Printouts (432
kb) |
| |
Appendix G - Rate of Return Analysis Worksheets (580 kb) |
|
Springfield Downtown Streets Conversion Study (2011) |
| |
Study without Appendices (916 kb) |
| |
Figures (18.0 mb) |
| |
Appendix A - Purpose and Need
(114 kb) |
| |
Appendix B |
| |
1:
Public Involvement Plan (194 kb) |
| |
2:
Stakeholders (18.7 mb) |
| |
3:
Public (33.3 mb) |
| |
4:
Media Record (4.49 mb) |
| |
5:
Public Comments (573 kb) |
| |
Appendix C - Traffic Modeling (5.33 mb) |
| |
Appendix D - Walking Audit (2.44 mb) |
| |
Appendix E - Red Flag Summary (172 kb) |
| |
Appendix F - Resources (2.51 mb) |
| |
Appendix G - Unified Plan (1.09 mb) |
| |
Appendix H - Opinion of Probable Construction Cost (54.2
kb) |
|
Northridge Sub-Area Study (2011) |
| |
Study without Appendices (2.41 mb) |
| |
Appendix A - Traffic Data (5.25 mb) |
| |
Appendix B - Land Use and Traffic Modeling Documentation
(2.21 mb) |
| |
Appendix C - Turning Movement Volumes (964 kb) |
| |
Appendix D - Capacity Analysis Reports (982 kb) |
| |
Appendix E - Traffic Signal Warrants (790 kb) |
| |
Appendix F - Turn Lane Warrants (702 kb) |
| |
Appendix G - Crash Diagrams (15.5 mb) |
| |
Appendix H - Cost Estimates (785 kb) |
| |
Appendix I - Public Involvement Documentation (987 kb) |
|
SR235 Corridor Study (2012) |
| |
Study without Appendices (3.77 mb) |
| |
Appendix A - Existing Conditions (6.59 mb) |
| |
Appendix B - Traffic Counts (11.7 mb) |
| |
Appendix C - Crash Analysis (227 kb) |
| |
Appendix D - Capacity Analysis Reports (450 kb) |
| |
Appendix E - Future Traffic Projections (710 kb) |
| |
Appendix F - Stakeholder Meetings & Open House (13.5 mb) |
| |
Appendix G - Technical Information (433 kb) |