Studies and Projects

Studies from 2018 are listed below.  To access older studies, click on the appropriate button at the bottom of the list.

Laybourne Road Relocation Feasibility Study (2019)
  Feasibility Study (11.0 mb)
  Appendices (42.0 mb)
 
SR41 and IR70 Traffic Impact Study (2019)
  Traffic Impact Study (1.93 mb)
  Appendix (7.13 mb)
 
SR54 and IR70 Traffic Impact Study (2019)
  Traffic Impact Study (9.76 mb)
  Appendix (11.2 mb)
 
Plum Street Bridge Study (2018)
  Bridge Modification Feasibility Study (27.3 mb)
 
Mad River Trail Feasibility Study (2018)
  Trail Feasibility Study (24.2 mb)
   

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Copyright © 2004 Springfield TCC