Studies and Projects

Interstate 70 Corridor Study (2002)
  Interstate 70 Corridor Study (entire document, 1.90 Mb)
  Text Only (704 kb)
  Map 1 - MIS Study Area (320 kb)
  Map 2 - 1998 ADT Locations (352 kb)
  Map 3 - Level of Service 2025 (352 kb)
  Map 4 - Proposed Construction Schedule (320 kb)
 
South Limestone Street Corridor (2003)
  Conceptual Streetscape Master Plan (entire document, 4.49 Mb)
  Picture 1 - Overall Master Plan Rendering (1.35 Mb)
  Picture 2 - Interchange (1.1 Mb)
  Picture 3 - Rotation of Interchange (1.1 Mb)
 
Lower Valley Pike Scenic Byway Plan (2004)
  Lower Valley Pike Scenic Byway Plan (entire document, 2.0 Mb)
 
State Route 794 Sub Area Study (2006)
  Study without Appendices (14.1 Mb)
  Map 1 - Preferred Alternative D1 (1.0 Mb)
  Appendix A - Cultural Resources Red Flag Summary (435 kb)
  Appendix B - Ecological Resources Red Flag Summary (799 kb)
  Appendix C - Hazardous Materials (1.5 Mb)
  Appendix D - Geotechnical Resource Review (52.3 Mb)
  Appendix E - Public Involvement (140.4 Mb)
  Appendix F - Property Tax Values (133 kb)
  Appendix G - Preliminary CE Document (1.1 Mb)
 
US68/US40/SR4/Upper Valley Pike Sub Area Study (2006)
  Study without Appendices (8.89 mb)
  Appendix A - Certified Traffic (265 kb)
  Appendix B - Crash Diagrams (209 kb)
  Appendix C - PI Plan & Meeting Summary (6.51 mb)
  Appendix D - Purpose & Need (2.83 mb)
  Appendix E - Red Flag Summary (10.8 mb)
  Appendix F - Capacity Analysis (18.8 mb)
 
Lower Valley Pike Safety Study (2009)
  Study without Appendices (1.5 MB)
  Appendix A - Physical Condition Diagrams (413 kb)
  Appendix B - Section Photos (35.7 MB)
  Appendix C - Intersection Photos (34.6 MB)
  Appendix D - Crash Diagrams (1.7 MB)
  Appendix E - Traffic Count Data (278 kb)
  Appendix F - Highway Capacity Analysis Printouts (432 kb)
  Appendix G - Rate of Return Analysis Worksheets (580 kb)
 
Springfield Downtown Streets Conversion Study (2011)
  Study without Appendices (916 kb)
  Figures (18.0 mb)
  Appendix A - Purpose and Need (114 kb)
  Appendix B
    1: Public Involvement Plan (194 kb)
    2: Stakeholders (18.7 mb)
    3: Public (33.3 mb)
    4: Media Record (4.49 mb)
    5: Public Comments (573 kb)
  Appendix C - Traffic Modeling (5.33 mb)
  Appendix D - Walking Audit (2.44 mb)
  Appendix E - Red Flag Summary (172 kb)
  Appendix F - Resources (2.51 mb)
  Appendix G - Unified Plan (1.09 mb)
  Appendix H - Opinion of Probable Construction Cost (54.2 kb)
 
Northridge Sub-Area Study (2011)
  Study without Appendices (2.41 mb)
  Appendix A - Traffic Data (5.25 mb)
  Appendix B - Land Use and Traffic Modeling Documentation (2.21 mb)
  Appendix C - Turning Movement Volumes (964 kb)
  Appendix D - Capacity Analysis Reports (982 kb)
  Appendix E - Traffic Signal Warrants (790 kb)
  Appendix F - Turn Lane Warrants (702 kb)
  Appendix G - Crash Diagrams (15.5 mb)
  Appendix H - Cost Estimates (785 kb)
  Appendix I - Public Involvement Documentation (987 kb)
 
SR235 Corridor Study (2012)
  Study without Appendices (3.77 mb)
  Appendix A - Existing Conditions (6.59 mb)
  Appendix B - Traffic Counts (11.7 mb)
  Appendix C - Crash Analysis (227 kb)
  Appendix D - Capacity Analysis Reports (450 kb)
  Appendix E - Future Traffic Projections (710 kb)
  Appendix F - Stakeholder Meetings & Open House (13.5 mb)
  Appendix G - Technical Information (433 kb)
 
New Carlisle Crosswalk Study (2014)
  New Carlisle Crosswalk Study (full document 14.2 mb)
  Study without Appendices (10.5 mb)
  Appendix A - Traffic Counts (165 kb)
  Appendix B - Crash Data (2.95 mb)
  Appendix C - Capacity Analysis (163 kb)
  Appendix D - Pedestrian Hybrid Guidelines (146 kb)
  Appendix E - Observation Notes (289 kb)
  Appendix F - Conceptual Cost Estimates (241 kb)
 

Croft Road Corridor Study (2014)

  Croft Road Corridor Study (full document 77.3 mb)
  Study without Appendices (50 mb)
  Appendix 1 - Traffic Count Data (127 kb)
  Appendix 2 - Traffic Signal Warrant & Stop Control (71.4 kb)
  Appendix 3 - Synchro & SIDRA Capacity Analysis (535 kb)
  Appendix 4 - ODOT Turn Lane Calculations (312 kb)
  Appendix 5 - Croft Road Pedestrian & Bicycle Plan (4.97 mb)
  Appendix 6 - Bridge Railing Adequacy Check (145 kb)
  Appendix 7 - Cost Estimate (91.1 kb)
  Appendix 8 - RRFB & Cross Alert System Details (291 kb)
  Appendix 9 - Roadway Design Criteria (113 kb)
  Appendix 10 - Existing Conditions Memo (13.8 kb)
 
Clark County Signals Study (2014)
  Clark County Signals Study (full document 16.4 mb)
  Study without Appendices (5.08 mb)
  Appendix A - Field Observation Notes & Photo Log (7.51 mb)
  Appendix B - Roadway Design Criteria Documents (385 kb)
  Appendix C - Traffic Count Data (2.79 mb)
  Appendix D - Crash Data (253 kb)
  Appendix E - Signal Warrant and Multi-Way Stop Application Analysis (226 kb)
  Appendix F - Synchro 8.0 Results (1.00 mb)
  Appendix G - Conceptual Cost Estimates (220 kb)
  Appendix H - Preliminary SWISS Calculations (236 kb)
  Appendix I - ODOT Recommended Turn Lane Length Calculations (208 kb)
 
SR235/Church/Linden Intersection Study (2014)
  New Carlisle Intersection Study (full document, 17.6 mb)
  Study without Appendices (7.24 mb)
  Appendix A - Field Observation Notes & Photo Log (1.86 mb)
  Appendix B - Traffic Count Data (333 kb)
  Appendix C - Crash Data (210 kb)
  Appendix D - PC Warrants Signal Warrant (195 kb)
  Appendix E - Synchro 8.0 & RODEL Results (902 kb)
  Appendix F - ODOT Recommended Turn Lane Length Calculations (448 kb)
 
Columbia and Center Street Traffic Signal Warrant Study (2015)
  Columbia and Center Street Study (902 kb)
 
Clark County Multi-Use Trail Needs Assessment (2015)
  Trail Needs Assessment (full document, 4.48 mb)
  Study without Appendices (2.17 mb)
  Appendix A - Clark County Trails Map (142 kb)
  Appendix B - Maps of Pavement Condition Rating Segments (1.85 mb)
  Appendix C - Buck Creek Scenic Trail PCR (84.4 kb)
  Appendix D - Little Miami Scenic Trail PCR-NTPRD (66.6 kb)
  Appendix E - Simon Kenton Trail PCR (94.9 kb)
  Appendix F - Little Miami Trail PCR-CCPD (80.3 kb)
  Appendix G - Prairie Grass Trail PCR (94.1 kb)
  Appendix H - Pavement Distresses, Repair Recommendations and Cost Estimates (131 kb)
  Appendix I - Detailed Cost Estimates (175 kb)
  Appendix J - Construction Specifications (116 kb)
  Appendix K - Additional Buck Creek Replacement (283 kb)
 
Bechtle Avenue and St. Paris Connector (2015)
  Traffic Impact Study (full document, 3.68 mb)
  Study without Appendices (2.82 mb)
  Appendix - Traffic Counts (240 kb)
  Appendix - HCS 2010 Analysis Output (595 kb)
  Appendix - Sidra Analysis Output (152 kb)
   
South Limestone Street Corridor Study (2017)
  Corridor Study - without Appendices (25.5 mb)
  Appendix A - Stakeholder Group Meeting Summary (42.5 mb)
  Appendix B - Public Meeting Summaries (79.0 mb)
  Appendix C - CAM Tool Output (87 kb)
  Appendix D - ECAT Output (445 kb)
  Appendix E - TDM Model Output (380 kb)
  Appendix F - Future Volume Calculations (197 kb)
  Appendix G - No Build Analysis Output (152 kb)
  Appendix H - Scenario Exhibits (18.3 mb)
  Appendix I - Scenario Analysis Output (347 kb)
  Appendix J - Scenario Cost Estimates (172 kb)
  Appendix K - Recommended Scenario Exhibit (12.3 mb)
  Appendix L - Recommended Scenario Analysis Output (173 kb)
  Appendix M - Recommended Scenario Cost Estimate (178 kb)
   
Derr Road (2017)
  Corridor Study - without Appendices (37.7 mb)
  Appendix A - CAM Tool Output (77.7 kb)
  Appendix B - TDM Output (181 kb)
  Appendix C - 2040 Volume Forecast Calculations (254 kb)
  Appendix D - Synchro Analysis Output (873 kb)
  Appendix E - Emission Reductions Calculations (504 kb)
  Appendix F - FHWA Case Studies (544 kb)
  Appendix G - Bicycle Facility Alternatives Cost Estimates (266 kb)

 

 
Copyright © 2004 Springfield TCC