Studies and Projects (2014-2015)

To access older studies, click on the appropriate button at the bottom of the list.  To return to the main page of Studies and Projects click here.

SR235/Church/Linden Intersection Study (2014)
  New Carlisle Intersection Study (full document, 17.6 mb)
  Study without Appendices (7.24 mb)
  Appendix A - Field Observation Notes & Photo Log (1.86 mb)
  Appendix B - Traffic Count Data (333 kb)
  Appendix C - Crash Data (210 kb)
  Appendix D - PC Warrants Signal Warrant (195 kb)
  Appendix E - Synchro 8.0 & RODEL Results (902 kb)
  Appendix F - ODOT Recommended Turn Lane Length Calculations (448 kb)
 
Columbia and Center Street Traffic Signal Warrant Study (2015)
  Columbia and Center Street Study (902 kb)
 
Clark County Multi-Use Trail Needs Assessment (2015)
  Trail Needs Assessment (full document, 4.48 mb)
  Study without Appendices (2.17 mb)
  Appendix A - Clark County Trails Map (142 kb)
  Appendix B - Maps of Pavement Condition Rating Segments (1.85 mb)
  Appendix C - Buck Creek Scenic Trail PCR (84.4 kb)
  Appendix D - Little Miami Scenic Trail PCR-NTPRD (66.6 kb)
  Appendix E - Simon Kenton Trail PCR (94.9 kb)
  Appendix F - Little Miami Trail PCR-CCPD (80.3 kb)
  Appendix G - Prairie Grass Trail PCR (94.1 kb)
  Appendix H - Pavement Distresses, Repair Recommendations and Cost Estimates (131 kb)
  Appendix I - Detailed Cost Estimates (175 kb)
  Appendix J - Construction Specifications (116 kb)
  Appendix K - Additional Buck Creek Replacement (283 kb)
 
Bechtle Avenue and St. Paris Connector (2015)
  Traffic Impact Study (full document, 3.68 mb)
  Study without Appendices (2.82 mb)
  Appendix - Traffic Counts (240 kb)
  Appendix - HCS 2010 Analysis Output (595 kb)
  Appendix - Sidra Analysis Output (152 kb)
   
   

 

 
Copyright © 2004 Springfield TCC