Studies and Projects (2017)

To access older studies, click on the appropriate button at the bottom of the page.  To return to the main page of Studies and Projects click here.

South Limestone Street Corridor Study (2017)
  Corridor Study - without Appendices (25.5 mb)
  Appendix A - Stakeholder Group Meeting Summary (42.5 mb)
  Appendix B - Public Meeting Summaries (79.0 mb)
  Appendix C - CAM Tool Output (87 kb)
  Appendix D - ECAT Output (445 kb)
  Appendix E - TDM Model Output (380 kb)
  Appendix F - Future Volume Calculations (197 kb)
  Appendix G - No Build Analysis Output (152 kb)
  Appendix H - Scenario Exhibits (18.3 mb)
  Appendix I - Scenario Analysis Output (347 kb)
  Appendix J - Scenario Cost Estimates (172 kb)
  Appendix K - Recommended Scenario Exhibit (12.3 mb)
  Appendix L - Recommended Scenario Analysis Output (173 kb)
  Appendix M - Recommended Scenario Cost Estimate (178 kb)
   
Derr Road and Home Road Conversion Feasibility Study (2017)
  Corridor Study - without Appendices (37.7 mb)
  Appendix A - CAM Tool Output (77.7 kb)
  Appendix B - TDM Output (181 kb)
  Appendix C - 2040 Volume Forecast Calculations (254 kb)
  Appendix D - Synchro Analysis Output (873 kb)
  Appendix E - Emission Reductions Calculations (504 kb)
  Appendix F - FHWA Case Studies (544 kb)
  Appendix G - Bicycle Facility Alternatives Cost Estimates (266 kb)
   
CR68 Access Analysis (2017)
  Analysis Tech Memo - without Appendices (5.39 mb)
  Appendix (4.84 mb)
   
   

 

 

 

 

 
Copyright © 2004 Springfield TCC